ClearPermit — the operating layer for planning and permitting

Make projects submission-ready up to 6–8 weeks earlier.

Modeled · authority timeline unchanged

ClearPermit predicts project-specific permit requirements on Day 0, then prepares the plans, calculations and regulatory checks while the authority prepares its official file.

See It Happen No login · approximately 90 seconds

Project recordEntered once

The real site with the customer-marked project boundary, before any system is generatedMarked siteRealistic visualization of the generated system on the siteVisualization

Predict6 requirements at Day 0

Day 0 Forecast

1 condition flagged

Expected route · 5 stages

Prepare5 professional components

Professional site plan on the certified survey — real project drawing, shown as the submission-package artifactProfessional plan + checksSite plan · cross-sectionsArea schedule · rights checkRegulatory checks · package draft

Verify1 licensed decision

Official file vs forecast

6 of 7 already underway

LearnReused on the next similar project

Project-type profile

Ground-mounted area rule

Real case · 6 predicted · 5 prepared · 6 of 7 underway · 1 licensed decision

The problem

Permitting is still assembled by hand.

Teams search fragmented sources, interpret plans and regulations, calculate areas, draft drawings and re-check disconnected work—often only after the authority’s official requirements arrive.

ClearPermit turns the 40–50 business-day authority wait into a parallel preparation window.

Traditional
Day 0Wait for official requirements40–50 business days · modeledAuthority responseBegin package preparationSubmission-ready
ClearPermit
Day 0Predict + prepare in parallelAuthority responseCompare with official requirementsLicensed professional approvalSubmission-ready up to 6–8 weeks earlierModeled

The authority’s timeline stays the same. Your project becomes submission-ready up to 6–8 weeks earlier.

Modeled

Project-to-permit transformation

From one project record to coordinated permit work.

Enters once

One project record

Customer System Layout generated from the marked project area
  • Marked site
  • System layout
  • Certified site survey
  • Project parameters
  • Planning rules
  • Day 0 Forecast
ClearPermit Project-to-Permit Engine1 decision routed to the licensed architect

Prepared in parallel

Coordinated permit work

Professional site plan on the certified survey — real project drawing, shown as the submission-package artifact
  • Area Schedule
  • Planning Rights Check
  • Regulatory Checks
  • Detailed Site Plan
  • System Cross-Sections
  • Submission Package Draft

Work normally searched, calculated, checked and drawn by hand becomes one connected, repeatable system.

Professional interpretation and approval remain with the licensed architect

Why it compounds

Permitting no longer starts from zero.

Every licensed interpretation is saved by project type and reused in the next Day 0 Forecast. Across projects, those verified decisions build a growing regulatory intelligence layer. Each entry is a licensed professional’s verified interpretation from a real project—not a generic rule summary.

This project

Professional verification required

Ground-mounted area rule

Licensed architect

Interpretation verified by the licensed architect

Ground-mounted area rule

Project-type profile

Verified interpretation saved to the project-type profile

Ground-mounted area rule

Next similar project

Included in the next similar project’s Day 0 Forecast

Ground-mounted area rule

Every verified project makes the next one smarter.

Beyond solar

Solar is the starting point. ClearPermit is building the regulatory intelligence layer for planning and permitting.

The same operating model can expand across project types and local regulatory workflows as verified knowledge accumulates.

See It Happen No login · approximately 90 seconds